Three unfinished wooden dome shells on raised platforms among trees

Built by Hand · One Project at a Time

Watch Dragon's Tooth take shape.

Real photographs, dated progress, and a clear line between what is being built and what is ready for guests.

Latest photo update · October 2, 2026

The honest status

Construction is underway. Future reservations are closed.

These photographs show unfinished structures on an active build. They are not finished guest rooms and are not proof that any planned stay is ready. Final amenities, rates, policies, opening dates, and bookable inventory will appear only after they are confirmed.

Check Booking Status

Dated Construction Record

The dome build, as it really looked

Each entry is tied to the date captured by the original photograph. The notes describe only what is visible.

Unfinished wooden dome shell raised on a platform in the woods, with exposed construction wrap at its base

The dome shells were standing

The exterior photograph shows the wooden triangular shell above a raised platform. The lower wall area remained wrapped and open, with building materials still on site.

Progress photograph — not a finished guest cabin.

Interior of an unfinished wooden dome showing triangular framing, wall panels, a rolling scaffold, and an open floor

Inside the geometry

Inside, the photograph records the repeating triangular frame, partially covered wall sections, lower-wall framing, and the working scaffold used during construction.

No finished interior, furnishings, or guest amenities are shown.

Unfinished dome interior with triangular wooden wall panels, exposed framing, and loose panels on the floor

Interior panel work continued

The later interior photograph shows more triangular wall sections in place while lower framing and loose panels remained visible. The room was still a construction space.

The photograph records progress; it does not establish completion.

Two unfinished wooden dome structures with framed doorway openings, construction wrap, ladders, and temporary access ramps

Doorway openings took shape

Two structures are shown with framed doorway openings. Construction wrap, ladders, temporary ramps, and exposed lower walls make the unfinished status clear.

Latest supplied progress image as of October 2, 2026.

What We Are Working Toward

The planned guest stays

These are construction targets, not open listings. Every future option stays visibly closed until the real room, rate, policies, and opening date are ready.

Planned · reservations closed

Three 10 × 14 glamping tents

Three supplied glamping tents are planned on wooden platforms for the spring 2027 opening phase.

  • Final furnishings and amenities pending
  • Rates and opening date not yet published
Planned · reservations closed

Two dome cabins

Two dome-cabin stays are planned for spring 2027. The dated photographs above show construction, not completed rentals.

  • Final cabin details pending
  • No reservations accepted yet
Future phase · reservations closed

Three-dome cabin

A separate three-dome cabin is targeted for completion by the end of summer 2027.

  • Target date may move with construction
  • Not included in spring inventory
Planned · reservations closed

Bunkhouse

The bunkhouse is being designed as a later guest option. Its current planning horizon is roughly 24–30 months from October 2026.

  • No completed bunkhouse is represented here
  • No rates or reservations yet

Five hiker-parking spots are also planned in the booking inventory. Current BYO tent and parking requests continue to be confirmed manually from the homepage.

Before You Plan a Trip

Check what is actually open.

The booking-status page will show when online reservations, real availability, and card payment have passed testing. Until then, use the existing form only for current BYO tent or parking requests and general questions.